Place Cartier Suites Hotel

Place Cartier Suites Hotel

Completed: March 1998

Owner/Architect: Hans Stutz

Project: A 9-storey addition to an existing hotel. The project posed various interesting construction problems:

  • The small, tight site, located downtown, was squeezed between two high-rise buildings.
  • The deep foundation posed access difficulties.
  • Portions of the addition were constructed over an existing parking garage.
  • The addition tied into the existing building at all ten levels.
  • Construction was carried out while the existing facility was occupied.

The project was completed two months ahead of schedule and within budget.